
Nunese delivers feasibility and study-stage engineering for coal mining and coal terminals across New South Wales (NSW) — from study-stage layouts through detailed design, certification and site support on operating mine, port and refinery assets.
Our NSW work routinely includes greenfield mine and refinery study stages, coordinated with geotechnical, mechanical and process interfaces so platform levels, foundations and structural steel align before steel is ordered or concrete is poured.
Typical NSW scopes include concept and pfs layouts with structural and civil risk identification, with drawings and calculations issued for certifier review, procurement and construction sequencing. We document load paths, design actions and interface assumptions so steel fabricators, concrete contractors and site teams can build without ambiguity.
With an office at North Wollongong (Innovation Campus), Nunese provides local accountability for NSW clients while drawing on national delivery experience across mining, ports and refineries. Contact us to discuss scope, programme and fee for your feasibility and study-stage engineering requirements.
Feasibility Studies for NSW industries
New South Wales heavy industry spans coal mining and chpp infrastructure, ports and bulk terminals and adjacent sectors. The scopes below summarise where our feasibility and study-stage engineering is most often applied on NSW assets — aligned to the outcomes we routinely deliver for owners and EPCM teams.
- Coal mining and CHPP infrastructure
- Ports and bulk terminals
- Mineral sands refineries
- Steelworks and heavy industry
- Concept and PFS layouts with structural and civil risk identification
- Feasibility design packages supporting investment decisions
- CAPEX/quantity inputs and constructability reviews
- greenfield mine and refinery study stages
- port expansion and terminal upgrade screening
Regions we serve in New South Wales
We support projects across Sydney, Wollongong, Newcastle, Hunter Valley, Central Coast and throughout New South Wales. Representative NSW experience includes port and mining infrastructure, mineral processing plants, and industrial brownfield upgrades — with deliverables tailored to remote access, cyclone or coastal exposure, and operating-site constraints where they apply.
Clients near North Wollongong (Innovation Campus) benefit from local meetings and faster turnaround on RFIs; clients elsewhere in New South Wales receive the same technical lead and document control standards. We maintain consistent naming, revision history and calculation references across multi-site NSW programmes.
Projects
NSW project experience
Representative work in New South Wales and similar heavy-industry environments.
NSW — common questions
Yes. Nunese delivers feasibility and study-stage engineering throughout New South Wales (NSW) for mining, ports, refineries and heavy industry clients — including coal mining and coal terminals and mineral sands processing.
We support projects across Sydney, Wollongong, Newcastle, Hunter Valley, Central Coast, Port Kembla, Illawarra, Balranald and other New South Wales locations. Scope is tailored to site access, study stage and your delivery model (owner, EPCM or site direct).
Contact us with your project location in New South Wales, study stage and key deliverables. We will confirm availability, propose a scope and provide a fee aligned to your programme — whether you need study support, detailed design or site-phase engineering.
Australia-wide
Engineering services by state and territory
Location-specific civil and structural engineering for mining, ports, refineries and heavy industry — tailored to each Australian jurisdiction.

