Project period · 2024–2025
Detailed structural design for greenfield gold mine infrastructure in Guinea — processing plant, conveyors, tanks and equipment foundations.
Project Context
The Kiniero gold project is a greenfield mining development in Guinea requiring detailed structural engineering for processing infrastructure, consistent with international mining standards and EPCM delivery models.
Engineering Scope
- Structural design of processing plant buildings and elevated steelwork
- Conveyor support structures, transfer towers and dynamic load considerations
- Tank foundations, bunds and equipment plinths
- Integration with mechanical and piping layouts for access, maintenance and lifting
- Design documentation suitable for international procurement and construction
- Response to RFIs and technical queries during contractor engagement
Standards And Coordination
Design referenced applicable Australian and project-specific standards, with attention to seismic/wind criteria, corrosion protection and fabrication tolerances appropriate to West African site conditions.
Outcomes
- Detailed structural packages for greenfield gold processing infrastructure
- Demonstrated international delivery alongside Australian mining portfolio
- Constructable details supporting remote site erection
Engineering capabilities applied